Regeneration process (heat regeneration of absorption bed, blowing of the absorption bed) will adopt compressed air direct from centrifugal air compressor or oil-free screw air compressor without utilizing the finished dry air from the absorptive dryer, thus achieving zero-consumption regeneration.
PLC intelligent control. Equipments are running automatically without personnel attained at site, with the operational status monitored on the local human-machine interface.
Low in pressure loss and stable dew points.
Applicable industries:
Regeneration process (heat regeneration of absorption bed, blowing of the absorption bed) will adopt compressed air direct from centrifugal air compressor or oil-free screw air compressor without utilizing the finished dry air from the absorptive dryer, thus achieving zero-consumption regeneration.
Delivery time:3 weeks ~ 6 weeks.